Boost
Boost

Well Completion Design

OGC-1831

Course Code

5 Days

Duration

5

Upcoming Dates

Download Brochure
Sector Logo

Sector Name

Oil, Gas and Chemical

Send by WhatsApp
31 Jan 2027 | 04 Feb 2027
Riyadh, KSA
$4,250
Limited Seats
24 May 2027 | 28 May 2027
Dubai, UAE
$4,250
Upcoming
19 Jul 2027 | 23 Jul 2027
London, England
$4,950
Upcoming
06 Sept 2027 | 10 Sept 2027
Online, Virtual
$2,150
Upcoming
18 Oct 2027 | 22 Oct 2027
Abu Dhabi, UAE
$4,250
Upcoming

Course Introduction

In the development of a hydrocarbon reservoir, many wells are drilled and require to be completed to allow the structure to
be depleted. However, the drilling and completion operations are crucial to the l ong term viability of the wells in meeting the specified objectives.
 

The design and completion of both production and injection wells are required to satisfy several objectives, including:
 
  • Provision of optimum production/injection performance
  • Ensure safety
  • Maximize the integrity and reliability of the completion over the envisaged life of the completed well
  • Minimize the total costs per unit volume of fluid produced or injected, i.e.
  • Minimize the costs of initial completion, maintaining production, and remedial measures

Course Objectives

  • Production Packer functions
  • Packers Types
  • Packers Generic Mechanisms
  • Permanent and Retrievable Packers
Download Brochure